07 - Day 7 - Production Manager
a) You will review with your direct supervisor the previous days lesson(s) and activities.
b) You will complete the e-Lesson Door Assembly and Staging 10.1 (How to video to be recorded)
As per work order, the Production Coordinator will demonstrate how to:
a) Make component corrections to the work order.
b) Implement production reporting SharePoint Hyper 1
c) Complete updating the work order
d) Release ERP generated credit holds when the order is ready to ship via email request to LBMchangerelease@parksite.com
e) As it related to the above you will simultaneously refer to SOP’s:
You will simultaneously refer to SOP’s:
The Material Handler will demonstrate how to pick and stage units/slabs for assigned delivery.
a) A local SME will explain and demonstrate the following manufacturing applications in Pronto:
b) As it relates to the above, you will simultaneously refer the following SOP’s
c) The SME will explain how to trouble shoot problematic orders as you reference the following SOP’s:
Under the supervision of an SME, you will:
a) Perform 5 Inquiries on a Work Order
b) Create 5 Work Orders
c) Perform Work Order Maintenance on 5 orders
d) Apply the Item Movement application on 5 orders
For the remainder of the day (minimum ½ day,) you will work with an assigned SME applying all previous lessons learned including but not limited to:
a) Making component corrections to work orders
b) Implement production reporting
c) Complete updating work orders
d) Release credit holds (when applicable)
e) Picking and staging units/slabs for delivery – refer to SOP DS-F 18.1 Transport Clip Installation
Name | View Schedule |
---|---|
1. BLR Safety Training - Working In Cold Conditions 10.1 | - |
2. BLR Safety Training - Ergonomics 10.1 | - |
3. Communication Basics 14.1 - Crucial Conversations and DISC | - |
4. Strategic Negotiations 10.1 | - |